Cynergy
Electric advocates single source project delivery within
the design and
construction community. The design-build method of
project delivery embraces engineering and construction
services under a single contact, thereby re-integrating
the roles of designer and constructor.
Cynergy focuses
its efforts on increasing the successful use of
innovative design-build teams on non-residential,
infrastructure and process industry projects. Our
capabilities
in the electrical-mechanical industry are simple
and competitive. Our team self performs millwright
(rigging)
and all facets of the electrical industry. Cynergy
specializes in medium voltage work tasks that most
electrical contractors cannot perform. Our seasoned
professional associates are capable of poly and
lead cable installations up to 35,000 volts.
You can view our recent project at the Fauquier County
Landfill. Methane landfill gas was designed to run
two 2-mega-watt generators to produce 35,000
volts delivered to the local utility. The project
consisted
of a pre-engineered metal structure to house
the generator and electrical equipment. A step-up
outdoor
substation
connects the 480 volt generated power to the
35,000 volt distribution voltage.
The landfill gas
was delivered to the engine generator using a compressor/dryer.
All process
piping was
stainless steel due to the caustic nature of
the fuel supply.
The engines were cooled using closed loop outdoor
cooling towers. The plant has been operated
for over a year.