Cynergy Electric Company, Inc.
   

 

Featured Project

Maryland Transportation Authority

Cynergy performed a circuit breaker, forced fan and fan controller replacement project with a contract value of $3.077 million at the Fort McHenry Tunnel for the Maryland Transportation Authority. The twelve existing double-ended substations are over 30 years old and fed the lighting, power circuits and ventilation fans in the East and West bound tunnels. Keeping the emergency circuits energized during the breaker and transformer upgrades was a critical part of the project. Only half of each substation was allowed to be completed at a time. Temporary circuits had to be installed from another substation to allow the critical circuits to remain in operation.  The work had to be closely coordinated and monitored by the Authority during the entire replacement process.

 

 

 

 

 

 

 

Read more about this project...

_________________________________________________

Proud Member Of

IEC

 

Design Build

Federal Building - Washington DC

Cynergy performed a design and build project for a branch of the Federal Government in Washington, DC at a contract value of $2.125 million. The existing building is over 100 years old, space was limited and security was tight. The project had to be approved by the National Capital Planning Commission (NCPC) and comply with the National Environmental Policy Act (NEPA), and DC air emissions requirements.

Read more about this project...

Click here to view Archieved Projects

 

 
Login About Us Projects Services Licenses Employment Contact Us Login